March 10, 2008
Lumber liquidators hardwood floors
Study of the project - Our project of Ossature house Drink Our project of Ossature house Drink. Afflicted for the little of news but one advances. Into full in the electric rails placo and wire small description with materials used. Livable house of 140m² (after some modifications of last minutes) + garage of 28m² and wash-house of 16m². It is composed of one rez of fitted 75m², roofs arranged of 47m²(utiles), the whole posed on a basement with a part on underfloor space of approximately 12m². For reason techniques related to the ground (retained and pushed grounds) the basement at summer made completely out of concrete rammed with walls of 20 cm eppaissor. The latter are posed on foundations of 60 cm broad and 1m of depth. Moreover is the overcost compared to tile concrete completely negligible (300? for the whole of the roof). Let us say that I would not remake my zinc works in ten years and color PVC or Zing did not marry at all with wood then. The heating electric at summer privilègier because the M.B are generally dwellings healthy and thus easy to heat and little applicant in energy (provided that that proves to be true. Second reason, the cost, very inferior with a standard central heating boiler and radiator + water circulation on the ground. In any event, considering the price of the fuel and gas, one do not take much risk. For the insulation, we chose to see our frame of the interior, breakdown, rafters, closes ect. what obliges to pose the insulation in "sarking" (by the top posed on the frame). There too, there is a good overcost (8000?) compared to glass wool between rafter and the whole hidden by beautiful a placo, but good, when wood is liked. Rigid rockwool 120 mm in panels "high density" for the walls R = 3,20 (rockmur 120). Finally the roof, after many research and comparative on all the levels (except phonic) we chose the TMS 100mm with a R = 4,35.35 but without cold bridge and into matéraux rigid (the R of EDF being calculated for rockwool in roller posed between rafters). A small thing with knowing, we had projected to pose to laminate everywhere on the ground. The floor heating electric interdict the installation of this material and "will thus be obliged to us" to pose either of the tiling, or of the parquet floor with the DRC. For the stage one preserves the strat considering one is in radiant panel. Here for the small summary, if you have questions or remarks, do not hesitate, that not made soon 2 months that the plans are règlés and one still wait the estimates, good, it is for this week, but mistrust. One starts to doubt the realization of the project, and in very honnèteté, one starts sèrieux to have dissatisfaction of them. Moreover, that influences the moral one much. One with nothing other to make to await, if not push a little the mayor of work with C Bon, finally one éssayer will be positif.ah yes hold, one have whom has to say that the foundations and the flagstone will not have been made per time of freezing and the blow, not of later problem of this there with dimensions. First of all, thank you with all for your support in the comments, it very sympathetic and that is done well pleasure. We took it as an independent project superintendent and make make the house by craftsmen. On the other hand, I do not profit from a contract of construction with all the guarantees that it comprises for the similar owner building but bon.toujours, one is guided by the door currency then one makes with. For a price manufacturer, I know that it is necessary at least count (for services of the more BASIC) 1500?/m². Maintenant, that is very to aléatoir according to materials' which you will employ, the architecture of the house, the percentage of car-construction which will carry out, the nature and the slope of your terrain.donc not easy to also know a price with the m². That at summer in fact our problem, one us at known as a house of so much of m², it will be thousands so much.) with of course "a small" cheque in its pocket to remake the plans (especially at the technical level) in order to check if all is cohérant. (Thing that I considered to be normal considering it will take the responsability of the implementation). on two or three opinions of M/O of the corner, it comes within province of the impossible one, (there, that do not become runs tout.on even starts to be badly made not concern and I would acknowledge you that the moral one is there less and less). But good, our research is continued, and there, 2nd problem, our project superintendent did not make of them too the case at the time (and due.) but the project is announced trés pèrieux considering the nature of our ground and the professionals whom we meet now do not want to take the risk to dig with 4.50m depth to make the S/S on the arriére of the house, they are afraid to be caught the ground on the nose but there, it is 2ou 3, cà starts to work us sèrieux and one puts sèrieuse questions as for the faisabilitè project, one even starts to inform oneself on the level manufacturer (even into traditional) with the idea to start again a project with zero. Construction that it with realized with the Ossabois company in Annecy, which makes me say that there is hardly chance of this with dimensions considering their prices with the m² bordering the 2000?. Finally one goes nevertheless éssayer, one never know. I telephone while falling on the M/O in question, I explain to him our case and là.surprise, anything with the surrealist air with his taste. At the end of 2h of interview to be presented to him in the details our projet/budget, nothing astonishes it, it east will faisable.faudra to put the hand at the paste, that it is certain. Second important thing which at summer raised by several of his/her colleagues, the nature of the ground. No the particular problem, the ground, it knows it, it is from here alors.il knows that it is not easy but it is far from being the first house built in the district and it with the practice of these situations. that is there one perhaps sees a gleam at the end of the tunnel, the moral cost with beautiful fixed and one is left by agreeing times of réflèxion mutually. One will be re-examined later to conclude if ever. There here is for the history, to date summons us and RDV is taken this after midday with him. At least now my project I know it until the end of the tuyau.c' is what still this muddle. That made at least 3 weeks that I was not in contact with him (one awaited our licence), then I decide to take the telephone and to inform me a good not very, I decide to call the room commercial of Dijon and there. Lastly, today, yesterday, or one week ago, that changes absolutely anything with the chmilblic. I call the liquidator to know what there in est.il is no more one under and quasi no hope of récupèrer no matter what is, same steps of the documents on my project. Lastly, as from this moment there, that is not used for nothing to look at behind, is necessary that one advances. Thus one makes a final cross on the last and it is necessary to seek another project superintendent. One with nevertheless our licence, one with large step lost choses.bon finally a little nevertheless but that does not call therefore the project in question donc.mais that was not a small matter. Thus at the beginning of the project, one would have rèvé of a trick as that finally more one advances and more one with the impression that that will finish rather like that. Good finally one éssayer will be reasonable and will arrive at something between the two I éssayer will recall our parcour beginning of the project until this days. It is decided, after many discussed with my half, one does not launch out in the purchase since our area (74) is awfully expensive in this field, but in the construction industry. After walls réflèxions, it will be a House Framework Drink (Mr. 1) Speed of execution (that will prevent us paying current rent too a long time + milked house time that it is made) 2) a healthier house on the level moisture than those done into traditional 3) an economic house in energy (it is known as that the M.B are very tempèré the winter like the éte) thus less heating and of clim. 4) the aspect drink outside like inside (beam out of frame and ceilings in joisting). 5) the price is saying more economic to construction than a house in agglo (we will see later than that is not inevitably the case). Good now that one with considering a little what one wanted, one will seek the financing. In short one seeks, all is implemented, knowledge, directories, is re-examined., and after some contacts, we decide following the council of somebody who with the air to know there in the M.B to call upon a young professional of the area of Dijon (21). I know, it is not the door with with dimensions but it then makes houses in all France. and then it with the air passioné by the house drink, it wants some and can apparently to then make us the house of our rèves for our budget. It is necessary nevertheless to know that one for summer to seek far what one could not offer to us in our corner (a house for our budget). In short, another good thing in fact, now, one will be able to put itself in the search of an easy terrain.pas in the corner, it does not have there great choice and considering the real boom of the area, all is at astronomical price. Tans worse, it is necessary there to go and visit. For visited, that one with still visited and visited and then. MARCH 2005: That is there, it is that there that we need, beautiful sight, quiet, only one neighbor in the vicinity, one would be the last to be established in short. "Not engraves any way it is that there that one wants, one will see well afterwards. Some photographs of the moment of our visit AUGUST 2005: After hard negotiations for which the salesman makes assemble the biddings, one thus signs one rolls up the handles and one nétoyer all that so that that gives ça.Désolé the photographs does not pass more, I éssaie will make the néscéssaire.2008 refusal of licence for a house OSB.2008 refusal of licence for a house OSB. your blog is super and m made marré well, J he appears that the house in framework drink by.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment